140 sq. m. of monolithic sidewalk on Augustus Ave. in Avonmore, including 2 TWSI plates and asphalt reinstatement
270 sq. m. of regular sidewalk on Church St. in Finch, including 4 TWSI plates
120 sq. m. of asphalt sidewalk on Concession St. in Crysler
Garry Cardiff Walkway and Curbs – Pedestrian and Sidewalk Replacement
180 sq. m. of concrete walkway and curb replacement and reinstatement
60 sq. m. of monolithic sidewalk
15 l.m. of barrier curb
2 drive-through pads
Following hydro connection for a new Ottawa Community Housing building
420 sq. m. of sidewalk reinstatement
260 sq. m. of asphalt reinstatement
12 TWSI plates
Following trenching for telecommunications
45 sq. m. of sidewalk reinstatement
15 sq. m. of asphalt reinstatement
3 TWSI plates
Abbott to Orville Streets following hydro connection work
210 sq. m. of sidewalk reinstatement
30 sq. m. of interlock reinstatement
8 TWSI plates